Henlow, Bedfordshire

Kitchen renovation, High Street, Henlow

A kitchen taken back to bare joists and floor, then rebuilt with dark green shaker units, a Belfast sink and new flooring.

A full kitchen renovation that started with a complete strip-out, taking the room back to bare brick, old pipework and a timber floor that had to come up entirely before rebuilding could start.

The finished kitchen is dark green shaker cabinetry with brass handles, white quartz worktops and a metro tile splashback, built around a gas hob and a built-in AEG oven. A Belfast sink and a stainless steel American-style fridge freezer complete the room, with a wooden dining table fitted in alongside.

Scope of works

  • Full kitchen strip-out, including old timber floor removal
  • Dark green shaker kitchen with brass handles
  • White quartz worktops and metro tile splashback
  • Belfast sink and American-style fridge freezer
  • New flooring throughout
Shaker style dark green kitchen with brass handles, white quartz worktops, metro tile splashback and gas hob, built-in AEG oven to the side, High Street, HenlowDark green kitchen cabinetry around a stainless steel American style fridge freezer, with a pendant light over a wooden dining tableKitchen mid renovation with freshly plastered walls, a wall mounted boiler, sink unit and dishwasher installed but worktops and flooring not yet fittedKitchen cabinets being installed, including a dark green wall unit with a built-in wine rack, plastered walls still bare and tools left on the worktopDark green wall cupboard above a wall mounted television and sideboard, next to a panelled wooden door in the finished kitchen dinerKitchen renovation in progress with flat pack cabinet carcasses and a boxed appliance on the floor, exposed brickwork and two workmen at the back doorKitchen stripped back to bare brick and old pipework during strip out, with damp staining on the lower wallsKitchen mid strip out with broken floor tiles and rubble scattered across the room and a worker clearing debris near the windowOld suspended timber floor removed down to bare earth and brick sleeper walls, exposed pipework and a radiator against the wallWorker in white protective coveralls amid thick dust during ceiling demolition, insulation and timber debris covering the floor

Get in touch

Request a quote

Tell us about your project and we'll come back to you to discuss it in more detail.

Prefer to talk it through first? info@jlsbpd.com

We use cookies to see how visitors use this site, so we know what to improve. We only set these if you accept them. See our cookie policy for details.