Extensions · · 1 min read

Building regulations approval explained: full plans, building notice and inspections

By JLS Building & Property Development

Timber roof joists on an extension under construction

Planning permission is about whether you can build something. Building regulations are about how it is built: structure, fire safety, insulation, ventilation, drainage, electrical safety and more. Most extensions, loft conversions, garage conversions and structural alterations need approval, and so do some kitchen and bathroom projects.

Who checks the work

Approval can be handled by your local authority's building control team or by a private registered building control approver. Either way, someone independent checks the plans and inspects the work as it goes. The government has a summary of how building regulations approval works, and the rules themselves are set out in the Approved Documents.

Full plans or building notice

  • Full plans: drawings and calculations are submitted and checked before work starts, and you get a decision. It is the more thorough route and the one we generally recommend for extensions.
  • Building notice: you tell building control you are starting work, without detailed plans, and they inspect on site. It can suit smaller jobs, but it leaves more risk with you if something has to be changed later, and it is not suitable for every project.

What gets inspected

Inspections are typically requested at set points: commencement, foundations before concrete is poured, drainage before it is covered, damp proof course, structural steelwork and timbers, insulation, and completion. Photographs and structural engineer calculations are often used as evidence. We arrange these as part of the programme so they do not hold up the job.

The completion certificate

When the work is signed off you receive a completion certificate. Keep it safe. A buyer's solicitor will ask for it if you sell, and it is your record that the work met the regulations. If work was done without approval, a regularisation application can sometimes be made afterwards, but it is slower and may mean opening up finished work for inspection.

Read how we run extension projects or contact us to talk through the approvals your project needs.

About the author

Written by JLS Building & Property Development Ltd, a family-run building contractor covering Bedfordshire, Cambridgeshire, Hertfordshire and Buckinghamshire. FMB member and SafeContractor approved. More about us. This guide is general information, not professional or legal advice for your specific project.

Questions

Frequently asked questions

Do I need building regulations approval and planning permission?+

They are separate. Some work needs both, some needs only one and some needs neither. An extension usually needs building regulations approval even where it falls under permitted development.

What is a completion certificate?+

It is the document issued when building control is satisfied that the completed work complies with the regulations. Solicitors and lenders often ask to see it when a property is sold or remortgaged.

Can I apply for approval after the work is done?+

In some cases a regularisation certificate can be applied for, but it can involve opening up work for inspection and is not guaranteed, so it is much better to apply before you start.

Get in touch

Request a quote

Tell us about your project and we'll come back to you to discuss it in more detail.

Prefer to talk it through first? info@jlsbpd.com

This form is for building and maintenance enquiries only. We don't reply to sales, marketing or SEO offers.

We use cookies to see how visitors use this site, so we know what to improve. We only set these if you accept them. See our cookie policy for details.