Skip to content
JLS Building & Property Development

Extensions · · 1 min read

Two-storey extension planning permission, explained

By JLS Building & Property Development

Two-storey rear extension shell under construction at a house in Sandy

We covered single-storey permitted development in our planning permission for extensions guide. A two-storey extension is a different, and tighter, set of rules, and it catches people out more often.

What permitted development allows for two storeys

Some two-storey rear extensions can be built under permitted development, but the limits are noticeably tighter than for a single-storey extension. Generally, the extension must not project more than 3 metres beyond the rear wall, and must stay at least 7 metres clear of the rear boundary. The roof pitch and materials generally need to match the existing house as closely as practicable.

What pushes it into a full application

Side extensions of two storeys, anything on a corner plot facing a highway, extensions that don't meet the boundary distance or projection limits, and any work on a listed building or in a conservation area typically need a full planning application rather than falling under permitted development.

Why we check before designing anything

Permitted development rules have genuine nuance depending on your specific property, whether rights have already been used, and local planning conditions that can remove permitted development rights entirely (called an Article 4 direction). We check the position for your actual house before any design work starts, rather than assuming a rule of thumb applies.

About the author

Written by JLS Building & Property Development Ltd, a family-run building contractor covering Bedfordshire, Cambridgeshire, Hertfordshire and Buckinghamshire. FMB member and SafeContractor approved. More about us. This guide is general information, not professional or legal advice for your specific project.

Questions

Frequently asked questions

Can I build a two-storey rear extension without planning permission?+

Sometimes, if it meets permitted development limits: generally no more than 3 metres projection and at least 7 metres from the rear boundary, with a matching roof pitch. We check your specific property against the current rules before assuming either way.

What is an Article 4 direction?+

A local planning condition that removes some or all permitted development rights in a specific area, meaning a project that would normally be permitted development needs a full application instead. It's worth checking with the local authority if you're in a sensitive area.

Do I need a Lawful Development Certificate for a two-storey extension built under permitted development?+

It's not compulsory, but it's useful to have as formal confirmation from the council, particularly if you sell the house later and a buyer's solicitor asks for proof the work didn't need permission.

Get in touch

Request a quote

Tell us about your project and we'll come back to you to discuss it in more detail.

Prefer to talk it through first? info@jlsbpd.com

This form is for building and maintenance enquiries only. We don't reply to sales, marketing or SEO offers.

We use cookies to see how visitors use this site, so we know what to improve. We only set these if you accept them. See our cookie policy for details.